While not neck breaking speed, progress continues at Page Street. Windows are being firmly placed with trim around, final siding is in place. Tar paper is on the roof.  And the adjustments for the large shower in the master have been made together with some tweaks to the window over the master shower and in the master bedroom. Gas lines are being routed and tested and the banquette in the breakfast area is framed. Good progress!