We stopped by the house today to see the progress and we have some for sure. We are fast approaching our pre-drywall walk-through which could be in less than a week. Progress of note was the blocking of the study wall for the cabinets, additional lighting, the installation of the sliding windows in the master bath, master bedroom and guest bath. About all we need now is the transom over the front door, a door and the window in the back door (half window with embedded blinds). Virtually all the trim is up and the house has been primed and the trim work is being sprayed. The roof is nearly on. Here are the latest pictures.