Friday, January 11, 2013

We are now in Stage 2

January 11, 2013

We visited the house this afternoon (and yesterday). Work continues on the inside - the electrician has done most of his work (with the exception of the options we had selected), the plumber was moving a toilet drain about 6" and the low-voltage wiring guy was doing the cable, Ethernet ports, ceiling speakers and so on. 

All but a few windows are in - the window over the large master shower, the window over the guest shower, the high window in the master bedroom fronting the back patio, the transom over the front door (we need a door) and the window with embedded blinds in the back door. The shingles are piled high on the roof but need installing.

That's about it for now!