Taped, Floated & Textured

February 9, 2013

Lots of progress this week. We've been sheetrocked, taped, floated and textured. So what's next? Well, with the walls and ceiling done, the painters can start on the inside at any time. Also, cabinets in the kitchen, baths, laundry, study and elsewhere can start to go in. Interior doors can be hung and the interior trim can be set in place around windows, doors, ceiling, floorboards, etc..

We also have our garage door hung - the only door missing is the front door - the transom window above it is waiting to be installed. Brick work on the front can start any time and the flooring folks can soon start as well. We remain excited and anxious to get in and start making it a home.

Breakfast & Family



Upstairs Hall

Entry & Dining

Kitchen, Breakfast, Family (laundry at left)

Kitchen, Breakfast


Family Room

Master Shower

Master Shower

Master Bedroom

Garage

Across the street
Garden Homes

4509 Page (4513 and 4517 at left are about to have foundations poured)

HEB Continues To Be Built