What a difference a day or two makes! When we last reported but 4 days ago, taping and floating and texturing of the walls had just been completed. Today we found lots of changes! There was cabinetry in the kitchen, laundry, study, master bath, and guest bath, plus most of the doors have been installed and most of the interior trim completed! Next up will be counter surfaces, flooring and the painters! We're excited!
| Breakfast/ Kitchen Cabinets |
| Study - Grey-stained maple workstations |
| Kitchen Cabinets - Maple |
| Pantry (outlet for wine fridge!) |
| Dining - w/Crown molding |
| Cabinet drawer detailing - slow close |
| Pull out garbage - left of sink |
| Pull out trays on either side of range |
| Doors to Master Bath |
| Master bath - dual medicine cabinets |
| Linen cabinets - Master bath |
| Master closet |
| Out back on the porch |
| Kitchen - Pano |
| Susan in breakfast/ kitchen |
| Stairs |