And the power is now on....
and the front door has been delivered - a classy (insulated fiberglass) "speak-easy" door. Also, plumbing fixtures are going in - and the all important toilettes. No solution yet to the blotchy kitchen ceiling but they are "working on it."
and the front door has been delivered - a classy (insulated fiberglass) "speak-easy" door. Also, plumbing fixtures are going in - and the all important toilettes. No solution yet to the blotchy kitchen ceiling but they are "working on it."
| "Speak-easy" Front Door |
| Throne (1/2 bath) |
| Half-Bath - sans the mirror |
| One shower head and control installed - master bath |
| Master Bath - awaiting counter tops and mirror |
| All important throne room (sheetrocking needed) |
| Under counter LED lighting |
| Kitchen |
| Front door prep - house number - transom |
| Linen cabinets - Master bath |
| This puppy will be humming this summer (16 SEER Carrier) |
| Over-sized garage w/lights and house number from alley |