So what is left? Well not that much BUT it takes time to get contractors to return to finish and repair. Next week we are hoping the painters will finish the painting indoors (missed spots, damage, corrections, etc...) The outside still needs a second coat of paint, caulking, etc... and the front door needs to be stained. Hopefully by the end of next week, the carpeting will be installed. We also need a gas meter so the furnace and gas appliances can be tested and functioning. Next the house needs to be cleaned and ready for City inspection. When that is done, all of the problems s/he finds plus anything we spot will need fixing. Also, once the inspection is done, we should get our 45 day notice for completion (it will take them that long to fix everything). We also need the back fenced moved back about 5' to give us some semblance of a backyard.
If delays continue, we might not close until June.
Here are a few new photos.
| Getting there! |
| Master Bath |
| Master Shower |
| Master Shower |
| New kitchen ceiling |
| Front door w/speak-easy window. |
| Kitchen |
| Guest Bath - 2nd Floor (still missing medicine cabinet) |